Confidential – London Hyperscale Client

A multi-storey data centre for a hyperscale client

This project comprising a total IT load in the region of 100MW, developed collaboratively with HDR Consulting engineers.

The development is unique in nature, in that it’s developed with zero gen back up, and advanced cooling technologies.

The development of this significant structure, on a restricted site in London, brings with it planning and speed to market challenges which studioNWA have successfully integrated into an urban settings, balancing design and efficiency through carefully considered design excellence.

Location: London
Client: Confidential
Architect: studioNWA
Mechanical & electrical engineer: HDR
Civil/structural engineer: HDR
IT power: Confidential
IT cooling: Confidential
IT area: Confidential


Social Media